[Trac-tickets] [The Trac Project] #1565: ticket weight

The Trac Project noreply at edgewall.com
Mon May 16 12:04:24 EDT 2005


#1565: ticket weight
---------------------------+------------------------------------------------
       Id:  1565           |      Status:  new                     
Component:  ticket system  |    Modified:  Mon May 16 12:04:23 2005
 Severity:  enhancement    |   Milestone:                          
 Priority:  low            |     Version:  0.8.1                   
    Owner:  jonas          |    Reporter:  greg at mtechsolutions.ca  
---------------------------+------------------------------------------------
 The roadmap can sometimes show a strange percentage, as not all tickets
 are equal. For example, if you have 4 tickets, 2 closed, 1 for something
 small, like a couple spelling mistakes, and one for something huge, like a
 new web interface, the roadmap will show 50% complete. Fix the spelling
 mistake, and you're at 75%, even though you spent 2 minutes on that, and
 have a lot more work to do on the bigger project.

 This could be fixed with weights for tickets. Could just be done with a
 dropdown and being able to select "Small" "Medium" "Big" (configurable via
 trac-admin, like priorities). It could also be implemented by assigning a
 weight to priorities and/or severities.

-- 
Ticket URL: <http://projects.edgewall.com/trac/ticket/1565>
The Trac Project <>


More information about the Trac-Tickets mailing list