#3408: Why does 'Resolving Ticket' change the status to 'Close'?
---------------------------+------------------------------------------------
Reporter: anonymous | Owner: jonas
Type: enhancement | Status: new
Priority: normal | Milestone:
Component: ticket system | Version: 0.9.6
Severity: normal | Keywords:
---------------------------+------------------------------------------------
Hello,
I'm a new user to Trac so please bear with me if this question has been
asked and answered in the past.
When a developer gets to the point of resolving the ticket as fixed or
whatever option, this changes the status of the ticket to close. This
makes it difficult to do regression testing as the tester doesn't know if
a ticket was retested and closed, or is closed due to the developer's fix
and needs to be regression tested. There doesn't seem to be a
distinction. The tester seems to be left with trying to figure out which
tickets they should go back and test.
In Bugzilla, the ticket is closed by the tester, so they know it is truly
closed. I believe that changing the 'resolved' state should not change
the status to closed, and that someone should actually go in to manually
change the status to 'closed'. Is there some configuration in Trac for us
to do this by ourselves, or some other convention people use to to make
this distinction?
--
Ticket URL: <http://trac.edgewall.org/ticket/3408>